Current Projects and Ongoing Activities
- Supply of TBM machine and systems for the tunnel opening work of tunnel at 17 km length and with 4, 8 meters diameter of Konya Plain irrigation project (Blue Tunnel)
- Supply of TBM machine and systems for the tunnel opening work of tunnel at 17 thousand 185 meters length and with 7 meters diameter of Urfa Plain irrigation project (Suruç Tunnel)
-
- Hydroelectricity Plants
- (License and Construction Phase)
-
- Giresun - 9MW
- Van - 10 MW
- Rize - 11 MW
-
- Solar Energy Plants
- (Research and Planning Phase)
-
- At Mediterranean region of Turkey (Preparation phase)
-
- Geothermal Energy Plants
- (License Phase)
-
- Sounding and research studies on Canakkale Tuzla basin
- Sounding and research studies on Manisa Alaşehir basin
- Measurement and examination of 5000 km conventional railway line
- Construction of 3 Automatic Dynamic Train Examination tunnels
- Works of 460 km railway line signalization, rehabilitation and line expansion in Boğazköprü – Yenice and Mersin – Toprakkale
- Twice measurement works of 400 km high speed train line and 800 km conventional line between Ankara – Istanbul with one examination machine
- Work of supply of 11 Road and Overhead Measurement Devices for High speed train
- Batıkent-OIZ (Sincan Organized Industry Zone) subway line, Signal System Setting (2 subways) line for Tandoğan – Keçiören and Kızılay – Çayyolu and construction of works of renewing the electro-mechanical system of current Kızılay – Batıkent Subway.
- Samsun light subway (SAMRAY) 2008- supply of 16 light rail subway trains.
- Kayseri light subway (KAYSERAY) 2nd Phase supply of 16 rail system vehicles.
- Line measurement and certification works of Konya – Ankara high speed train.