SUN GROUP



Current Projects and Ongoing Activities


  • Supply of TBM machine and systems for the tunnel opening work of tunnel at 17 km length and with 4, 8 meters diameter of Konya Plain irrigation project (Blue Tunnel)
  • Supply of TBM machine and systems for the tunnel opening work of tunnel at 17 thousand 185 meters length and with 7 meters diameter of Urfa Plain irrigation project (Suruç Tunnel)
  • Hydroelectricity Plants
    (License and Construction Phase)
    • Giresun - 9MW
    • Van - 10 MW
    • Rize - 11 MW
  • Solar Energy Plants
    (Research and Planning Phase)
    • At Mediterranean region of Turkey (Preparation phase)
  • Geothermal Energy Plants
    (License Phase)
    • Sounding and research studies on Canakkale Tuzla basin
    • Sounding and research studies on Manisa Alaşehir basin
  • Measurement and examination of 5000 km conventional railway line
  • Construction of 3 Automatic Dynamic Train Examination tunnels
  • Works of 460 km railway line signalization, rehabilitation and line expansion in Boğazköprü – Yenice and Mersin – Toprakkale
  • Twice measurement works of 400 km high speed train line and 800 km conventional line between Ankara – Istanbul with one examination machine
  • Work of supply of 11 Road and Overhead Measurement Devices for High speed train
  • Batıkent-OIZ (Sincan Organized Industry Zone) subway line, Signal System Setting (2 subways) line for Tandoğan – Keçiören and Kızılay – Çayyolu and construction of works of renewing the electro-mechanical system of current Kızılay – Batıkent Subway.
  • Samsun light subway (SAMRAY) 2008- supply of 16 light rail subway trains.
  • Kayseri light subway (KAYSERAY) 2nd Phase supply of 16 rail system vehicles.
  • Line measurement and certification works of Konya – Ankara high speed train.

Gallery